Search:
RussianEnglish
Korund
Revival of national industry!
About the companyNewsProductsRequired

News
News
Last news
Archive


Last news

12.08.2005
14.08. 05 The Day of the Builder


The construction department of the factory has finished the overhaul of the shop of paints and varnishes. The following works are written down in the building active: decorating of the head-office, asphalting of the territory inside and outside the factory and putting the square near the monument to Lenin in order. Work was completed successfully without employing of a lot of contractors. The administration succeeded in organizing a regular supply of building materials. The production of paint and varnishes at the factory enabled it to procure a necessary quantity of paint on time. The construction department has got down to dismantling of equipment at one of the blocks of the factory with the purpose to prepare the site for putting the production of esters into operation. The interior of the shops will be decorated in autumn and winter. We offer our congratulations to our builders; we wish them success in their work and new achievements.
Copyright © 2004 Korund
   Home    About the company    News    Products    Required    Sitemap

Rambler's Top100
Created by GraphitPowered by TreeGraph